iLagosCity

The Lagos - Ibadan Fast Rail Line

Schedules, fares, and stations on the Standard Gauge rail line connecting Ebute Metta (Lagos) to Moniya (Ibadan).

The Lagos - Ibadan Express Rail Line

The Lagos-Ibadan express train cuts the trip to 2.5 hours in modern air-conditioned carriages.

Stations and Stops Along the Line

The line connects Mobolaji Johnson Station in Ebute Metta (Lagos) to Moniya Station north of Ibadan, with intermediate stops including Abeokuta, also serving Ogun State's capital along the same route. This multi-station setup turns the line into a regional mobility corridor rather than a simple bilateral link between two cities, benefiting the whole Lagos-Abeokuta-Ibadan belt.

Standard Gauge: A Break From the Old Colonial Network

Unlike the old narrow-gauge rail network inherited from the colonial era, the Lagos-Ibadan line uses standard gauge technology, financed largely by a Chinese loan and built by China Civil Engineering Construction Corporation (CCECC). This upgrade allows significantly higher operating speeds than the old network, cutting the trip to about 2.5 hours versus several hours previously on the old line, while offering air-conditioned carriages and comfort closer to international standards.

A Still-Partial Shift Away From the Road

Despite its clear advantages in speed and comfort, the line has not yet fully displaced road transport on this route, with many travelers still favoring buses and private vehicles due to train frequency or scheduling flexibility. iLagosCity recommends booking tickets through the Nigerian Railway Corporation (NRC) system well in advance, as demand on this line regularly outstrips available seating, particularly during peak hours and holiday periods.

A Model for Future Network Expansion

The relative success of the Lagos-Ibadan line has served as a showcase to justify similar expansion projects toward other cities, notably Kano to the north and potentially Abuja in the longer term. This technical and operational precedent, despite significant initial construction delays, is regularly cited by federal authorities as proof that standard gauge can durably modernize Nigeria's rail network.

Last verified: 2026-03-01· Source: Nigerian Railway Corporation (NRC)